-
Who this checklist is for
-
The seven checks, in order
-
1. Lock the use case before you look at a single product page
-
2. Confirm the part number, not the word "compatible"
-
3. Write Zigbee features into the contract, not the spec sheet
-
4. Define the square-meter scope before you compare price per square meter
-
5. Put a named person on the wiring and the switch
-
6. Verify authorization, certification, and invoicing — in that order
-
7. Run the pre-delivery recheck
-
1. Lock the use case before you look at a single product page
-
What people get wrong
Who this checklist is for
If you manage ordering for a building that buys more than one kind of light, this is for you. Sports lighting is one animal. Zigbee-connected fixtures are another. Commercial displays are a third. Most purchasing problems I have run into weren't about price. They were about scope.
Seven checks, in the order I actually run them. The two that catch the most mistakes are step 2 and step 4 (which, honestly, is not where I would have guessed when I started).
The seven checks, in order
1. Lock the use case before you look at a single product page
Lighting for sports is specified differently from lighting for a warehouse aisle. Illuminance levels, glare control, color rendering — they all shift depending on where the fixture goes and who is looking at it. I don't accept a quote until the vendor has given me a photometric report that matches the actual installation geometry.
What I ask for: mounting height, activity level, viewing direction, and whether there is a competition-grade requirement. If a supplier sends a brochure instead of a report, that's the whole answer. Next.
2. Confirm the part number, not the word "compatible"
This is the step almost everyone skips, and it is the one that cost me the most.
Everyone told me to always verify part numbers before approving a replacement order. I only believed it after skipping that step once and eating an $800 mistake on a TV backlight board that did not fit the chassis we had.
What happened was simple. The quote said "Samsung LED TV backlight, compatible model D4GE." I assumed compatible meant identical across vendors. Didn't verify. Turned out each supplier had a slightly different interpretation — different strip length, different connector orientation, different driver spec. The board arrived, the tech held it up next to the old one, and the whole team went quiet.
Now I write the full model string into the purchase order — Samsung D4GE backlight, exact strip count, connector type, revision letter if there is one. Nobody ships "compatible" to us anymore. They ship the number or they don't ship.
3. Write Zigbee features into the contract, not the spec sheet
Zigbee features read beautifully on a datasheet and disappear the moment the order is placed. The spec sheet is marketing. The contract is the thing that gets enforced.
What I require in writing before signing: protocol version, how the device pairs with our existing controller, firmware support window, and who answers the phone when a firmware update breaks pairing six months later.
Three things I confirm with our IT lead first: which gateway we actually own, which protocol revision it runs, and whether the vendor has tested against that gateway specifically or just against "the Zigbee standard." (Note to self: get the gateway model written into the shared procurement file so I stop asking.)
4. Define the square-meter scope before you compare price per square meter
"Samsung Onyx LED cinema price per square meter" is a genuinely common search. The problem is that the number on its own tells you almost nothing, because every vendor defines the square meter differently.
What I want itemized before the price per square meter means anything: pixel pitch, actual screen dimensions, mounting structure, control system, spare parts package, freight, duties, and warranty terms. Without those separated out, two quotes are not comparable — they are two different products that happen to use the same unit.
What I mean is that the "cheapest" per-square-meter figure is really a sticker price, which is to say it excludes everything that actually gets installed, and by that I mean the frame, the driver cabinets, and the commissioning time. I have watched a lower quote land 20% higher than the higher one by the time the installation invoice arrived.
5. Put a named person on the wiring and the switch
You don't need to know how to wire up a light switch. You need to know that the person touching the switch has confirmed the wiring requirements — line and neutral availability, load capacity, dimmer compatibility, and whether the existing circuit can carry the fixture you are buying.
My check is short: who is doing the installation, is there a signed commissioning form, and who eats the cost if it has to be redone. If I can't answer those three in writing, the order waits. No exceptions.
6. Verify authorization, certification, and invoicing — in that order
For Samsung LED products, I ask for authorization or channel documentation. Not an email that says "we are authorized." A document. This matters for warranty claims later, and it matters for the finance side today.
I also confirm the UL mark on anything electrical and get a proper invoice capability check before the order is placed. That last one is not paranoia. A supplier with a great price once handed over a handwritten receipt, finance rejected the expense, and the difference came out of my department budget. I have verified invoicing capability on every new vendor since.
On efficiency or environmental claims, it's worth remembering that advertising rules bind suppliers here — per FTC guidance on advertising and the Green Guides (ftc.gov), substantive claims are supposed to be truthful and backed by evidence. As a buyer, my version of that is simple: ask for the test report rather than the badge on the box.
7. Run the pre-delivery recheck
The order isn't done when it's signed. The day before delivery, I confirm five things with the vendor: exact model, quantity, delivery window, site contact, and whether the spare parts package is actually on the truck.
Not glamorous. Not exciting. It has caught three wrong-model shipments in the last two years.
What people get wrong
- Reading "compatible" as "identical" — the most expensive four-letter assumption in procurement
- Comparing price per square meter without comparing scope
- Leaving installation responsibility implicit, then discovering it was nobody's job
- Skipping authorization and invoicing checks because the price looked good
The batch we finally received last quarter was acceptable. Not great, not terrible. Serviceable. The part number checked out, the invoice cleared, and the installer signed the form — which is really the whole point of the list.
Five minutes of verification beats five days of correction. It's the cheapest insurance I have ever bought for a department budget.
